Location: Arkhangelsk region, Novodvinsk town

Amount of investment: 6.5 billion RUR.
Production capacity: 264 thousand cubic meters per annum.
The plant was commissioned is scheduled for 2019.

A new evaporation plant will provide the evaporation of waste red and black liquors with regard to their formation at the maximal productivity of semichemical pulp and sulphate pulp boilers in paperboard production to ensure raw material provision to the two cardboard machines after their reconstruction. The combustion gases formed in the production process, completely eliminate the emissions from the new evaporator plant and production of semichemical pulp. Environment benefits the greatest from it. The construction of the new evaporator plant is carried out in the framework of the second phase of implementation of priority investment project in forest area "Cardboard production reconstruction".


Our functions

  • The General contractor for the project "Construction of the evaporator plant of Thermal power plant (TPP)-2"
  • The installation execution (standstill) on the object "Technical re-equipment of the vacuum-evaporating plant ЗА TPP-3 of pulp production"